24th November 2022
After digging the hole, we still needed to wait for written permission for the concrete to go in, but finally the day arrived!
Shoring has been added around the hole, to be removed when dried, to ensure neat edge. The tube for the scaffold pole to go into has had spokes welded to it for strength in the concrete, and so the scaffold pole doesn’t sink.
And then with the concrete
Now with the wood removed: